Method for treating power cable moisture

2 years ago 4980 0 News

1560147440826584.png


Ways to deal with moisture in power cables


At present, the power cables used in construction mainly use YJLV22 series cross-linked aluminum core cable and YJV22 series cross-linked copper core cable (10KV). 

Compared with overhead lines and old-fashioned oil-filled cables, this type of cable has good insulation performance and allows high operating temperatures. (up to 90 ° C), has good mechanical strength. 

A large number of applications of cables not only improves the reliability of power supply but also beautifies the city's cityscape and is worth promoting. 

However, in the long-term construction process, combined with a large number of feedback from the operating unit, it is found that the phenomenon that the cable is wetted by water has become a potential hidden danger affecting the safe operation of the cable.

1. Causes and hazards of cable flooding

(1) When the new whole cable is shipped from the factory, both ends are sealed with plastic sealing sleeves. 

However, after the construction site is used according to the actual situation, the remaining part is simply wrapped with plastic cloth to break the gap. 

It is placed in the open air and the seal is not good. For a long time, it will inevitably have water vapor infiltrated into the cable.

(2) When laying cables, it is necessary to cross roads, bridges, and culverts frequently. 

Due to weather or other reasons, many glasses of water are often accumulated in the cable trenches. 

In the process of laying, it is inevitable that the cable heads will be immersed in water. Because the plastic cloth is not tightly wrapped or damaged, the water enters the cable.

In addition, when the traction and the pipe are worn, the outer sheath or even the steel shovel is sometimes scratched. 

This phenomenon is particularly prominent when using mechanical traction.

(3) After the cable laying is completed, the cable head is not produced in time due to the limitation of on-site construction conditions, so the unsealed cable breakage is exposed to the air for a long time, even immersed in water, so that the water vapor enters the cable in large quantities.

(4) During the manufacture of the cable head, due to the negligence of the construction personnel, the newly processed cable ends may accidentally fall into the accumulated water at the site.

(5) In the normal operation of the cable, if a breakdown such a breakdown occurs for some reason, the water in the cable trench will enter the line inside the fault point.

In civil construction, especially when using large construction machinery It is not uncommon for a construction site to have cable breakage or breakdown due to various human factors.

2. The solution to the cable damp ingress

According to the current technical strength and existing equipment, it is very difficult to handle the inlet cable (such as using hot nitrogen pressure to dry it). 

In actual operation, if the cable head is found to be in the water, we can only see off the front end for a few meters to see if it is dry inside. 

If it is not, continue to see it forward. But if the entire cable has been flooded, there is nothing you can do.

Cable water intake should be mainly based on prevention. 

Through long-term practice, the following countermeasures are summarized:

(1) At present, we have adopted a cable of 8.7/10kV grade in the urban network 6kV system transformation.

The insulation thickness of this grade cable is 4.5mm, and the insulation thickness of the 6/10 kV grade cable is 3.4mm. 

Due to the increase in the insulation thickness of the cable, the field strength is reduced, and the aging of the water tree can be prevented. 

At the same time, since the 6kV neutral point small current grounding system is grounded in a single phase, the cable is subjected to a phase voltage of 1.73 times and is required. 

It takes 2 hours to run, so it is necessary to thicken the cable insulation.

(2) Since impurities, pores, etc. in the insulation are the starting point of water tree generation, the quality of the cable is essential to prevent water tree aging. 

When purchasing cables, we must choose manufacturers with high quality. 

We must carry out rigorous tests on the samples sent by each manufacturer, and require all manufacturers to bid, and choose high-quality and low-priced products.

(3) Ensure that the cable head is well sealed. 

The cable ends that are sawed, whether stacked or laid, should be sealed with plastic. It is best to use a special sealing sleeve for the cable to prevent moisture infiltration.

(4) After the wire is laid, it is necessary to make the cable head in time. If it is impossible to make it immediately due to conditional restrictions, the cable head is sealed and placed in an overhead position.

(5) Improve the technical quality of construction workers and strengthen the management of the cable head manufacturing process, which can effectively prevent the cable head from entering the water during the production process. 

The practice has proved that once the cable enters the water, the earliest breakdown phenomenon is often the cable head, so the wire head is made well and can extend the overall life of the cable. 

If the cable is peeling off the semiconductor layer, we first circumscribe the specified size on the semiconductor layer, then draw a few vertical lines, and then strip the semiconductor along the strip. 

When using a knife, the strength must be properly controlled. 

If it is too shallow, the semiconductor layer is difficult to remove. If it is too deep, it will damage the insulation layer and bring opportunities to the water tree. 

In the case of a cable that cannot be stripped by a semiconductor, the semi-conductive layer must be scraped off with a glass piece. 

This requires the construction personnel to be careful and careful. It is necessary to clean the semi-conductive layer and avoid damage to the main insulation. Smooth the main insulation surface.

6) When the cable is directly buried, we use PPR's new plastic pipe as the casing. The pipe is corrosion-resistant, the inner wall is smooth, and the strength and toughness are good, so the damage to the outer sheath of the cable can be greatly reduced.

(7) Due to the limitation of conditions, the local cable laying is in the form of direct burial or cable trench. It is located in a coastal area. 

The local area is mostly saline-alkali land. In addition, the drainage is not smooth, resulting in water accumulation in the cable trench or cable well. 

Therefore, in the early planning, the design of cable trenches, culverts, and cable wells should be coordinated with the civil construction party in time to facilitate the drainage of cable trenches (wells). 

At the same time, the bracket is pre-buried in the cable trench, and the cable is supported by the bracket.


Tags:
power cables
INQUIRY
主站蜘蛛池模板: 粉嫩少妇内射浓精VIDEOS|免费nb=a在线观看|素人啪啪|俺也去久久|亚洲=av=av天堂=av在线网毛片|国产蜜月一区二区三区在线看 | 成年人天堂com|亚洲无线看|97成人啪啪网|国产精品无码一二区免费播放|亚洲精品国产福利一二区|农村乱人伦一区二区 | 免费观看=a级毛片在线播放|特极毛片|男男做爰猛烈叫床视频gv|亚洲日本在线在线看片4k超清|一级黄色免费观看视频|亚洲第一福利网站在线观看 | #NAME?|99爱精品视频|久久久精品一区二区|国产大片一区二区三区|亚洲国产精品综合久久20|免费观看视频的网站 天天超逼|综合一区二区三区|鲍鱼=av在线|农村黄色片|国产96精品|亚洲热线99精品视频 | 亚洲精品久久国产精品|亚洲三区精品|麻豆精产一二三产区|午夜嫩草嘿嘿福利777777|亚洲日本久久|亚洲中文无码永久免弗 | 浓毛欧美老妇乱子伦视频|中文字幕丰满伦子无码|黄色片视频在线观看|亚洲视频综合|久草手机视频在线观看|91日韩国产 | 亚洲=av日韩=av无码黑人|亚洲国产成人=aV毛片大全|成人亚洲一区二区三区在线|亚洲成人在线观看视频|超碰97人人干|精品精品精品 | 韩国日本美国欧洲=aⅴ|91久久国产露脸精品国产闺蜜|国产热99|欧美肥老太交性视频免费|国产艳妇高清色视频在线观看|一级绝黄| 啊灬啊灬啊灬快高潮视频|国语自产少妇精品视频蜜桃|欧美专区一区|人人草人人爱|一级毛片在线观|欧美国产日韩另类视频区 | 完美世界免费观看完整在线观看|日韩黄色一级大片|粉嫩=aV久久一区二区三区王玥|三级全黄的视频在线观看|91亚洲精品丁香在线观看|色香蕉视频 | 亚洲日韩精品欧美一区二区一|蜜桃视频在线视频|久久亚洲一区二区三区四区五区|国产女性无套免费看网站|97色久水蜜桃|日本中文字幕=a∨在线观看 | 国产精品乱码一区二三区|成人福利午夜|日本久久久网站|99热导航|一本大道东京热无码视频|深夜福利免费观看 | 毛片大全|日本色频|亚洲色图偷拍自拍|在线观看片=a免费观看岛国|在线中文字幕-区二区三区四区|日韩欧美色图 | 成全高清视频免费观看|亚欧在线观看视频|天天躁日日躁狠狠躁欧美老妇|性感一级片|日韩一区免费观看|欧美日韩在线免费观看 | 99爱在线免费观看|亚洲日韩欧美精品国产|色婷婷偷拍|日本人jizz亚洲人|国产在线线精品宅男网址|午夜内射中出视频 | 97久久久久人妻精品区一|高潮视频免费|欧美一级大胆视频|超碰在线97免费|国产福利合集|7777精品伊久久久大香线蕉语言 | 人妻无码中文字幕|免费人成视频xvideos在线看|欧美色呦呦|久草在线中文视频|精品无码久久久久久久久水蜜桃|色婷婷久综合久久一本国产=aV | 韩国久久=av|V一区无码内射国产|超级碰碰色偷偷免费视频|国产成人自拍网站|日韩1区2区3区|欧美亚洲日本精品 | 精品国产成人一区二区99|综合一区在线观看|成人婷婷网色偷偷亚洲男人的天堂|欧美综合图区|国产精品=a无线|亚洲国产精品成人久久久麻豆 | 91成人小视频|国产精品乱码视频|日韩美女乱婬=a=a=a高清视频|www.xxxx欧美|欧美浓毛大BBwBBW|精品图区 在线观看免费v=a|国产久一|日本亚洲三级|c=aowo88国产欧美久久|能免费看的=av|97热精品视频官网 | 免费观看=a级毛片在线播放|特极毛片|男男做爰猛烈叫床视频gv|亚洲日本在线在线看片4k超清|一级黄色免费观看视频|亚洲第一福利网站在线观看 | 97超级碰碰人妻中文字幕|女人色毛茸茸视频|久久久精品欧美一区二区免费|四虎永久在线观看|国产激情91久久精品导航|欧美午夜影院免费观看 | 欧美丰满熟妇xxxx性大屁股|亚洲=aV无码国产精品草莓在线|91影视免费版|久久久久国精品产熟女久色|国产99久久久久久免费看|成年人黄色片视频 | 在线免费观看成年人视频|欧美日韩一区二区三区四区高清|激情免费看片|97久久超碰|www.蜜臀=av.com|亚洲=a一级 | 成人字幕网zmw|日本一区高清视频|#NAME?|麻豆播放|麻豆传媒作品|国产高清在线观看一区 | 久久国产福利一区二区|一本色道久久88精品综合|亚洲学生妹高清=av|WWW亚洲色大成网络|免费在线观看成人=av|亚洲天堂资源在线 | 久久毛片免费看一区二区三区|国产毛多水多高潮高清|一级黄色毛片|久久久久久久网|国产精品美女久久久久=av爽李琼|天天摸天天摸色综合舒服网 | 亚洲啪啪|麻豆视传媒短视频免费官网|成人啪啪178|一区二区三区四区高清精品免费观看|日本一区二区三区免费看|久草视频免费播放 | 四虎影视8848dd|国产99久久久国产精品|综合视频在线观看|人成在线|国产偷国产偷亚洲高清人白洁|法国一级毛片 | 日日操夜夜撸|日本69xxxxxxxx|性欧美videos另类hd|日本一区二区三区久久久久久久久不|国产午夜福利精品一区|久久国产亚洲精品赲碰热 | 最新国产精品毛片在线|和少妇做爰3p视频|www.youjizz.com在线观看|成人在线观看国产|成人久久精品|免费观看h视频 | 任你躁国产自任一区二区三区|日韩成人精品视频在线观看|少妇高潮呻吟=a片免费看软件|国产精品一区二区三区=av|成年免费视频黄网站在线观看|四虎WWW永久在线精品 | 国产女人的高潮大叫毛片|国产人妻一区二区三区|yw193最新视频|俺たちの熟女纱香60歳|激情成人黄色|久久精品人人做人人综合老师 | 丁香花在线影院观看在线播放|成人网页在线|日本一码二码三码在线|偷拍25位美女撒尿bbb片户外|十八禁韩国女主播vip秀362视频|色哺乳xxxxhd国产 | 搡女人真爽免费视频网站波兰美女|蜜臀99|多男一女一级淫片免费播放口|日本精品不卡|特级毛片=a级毛片免费观看R|免费成人精品视频 | 中国女人FREEXXXXXXX|一色一伦一区二区三区的区别|亚洲αⅴ无码乱码在线观看性色|怡春院综合|精品人妻无码一区二区三区百度|国产精品wwwwww | 中国=av在线免费观看|麻豆色播|一级毛片视频在线|一级免费片|毛片在线免费视频|中国一级女人毛片 | 亚洲另类在线视频|6精品国产乱码久久久久久|欧美黄色=av|日本高清视频网址|草草网站影院白丝内射|成人免费=a级毛片无码片 HD性丰满白嫩白嫩少妇=aV|免费成人黄色大片|久久精品中文字幕|久久无码国产专区精品|欧美=a∨|91精品一久久香蕉国产线看观看软件 | 巜豪妇荡乳2在线观看|又粗又硬进去好爽=a片视频野花|6969成人亚洲婷婷|99视频免费播放|97国产在线播放第一页|人人人澡人人人妻人人人少妇 | 欧美一区三区在线观看|中国黄色一及片|国产特黄色片|国产精华液一线二线三线|内射合集对白在线|日本免费无码XXXXX视频 | 最近中文字幕在线mv视频在线|#NAME?|色惰网站|草逼一区|免费精品国产的网站免费观看|播放日韩一级黄色片 |