As per Steven and Tyrion’s schedule, they arrived in Zhengzhou Dong Railway Station around 6pm, May 14th , where our colleagues had been waiting for them already. After greetings, we invited our clients to try some local traditional food, then took them to hotel to have a good rest before the factory visiting dated on the next day.
About 10am May 15th, we reached our factory together with our cleints, Steven and Tyrion. Firstly, there was a brief introduction prenstend in our meeting room. We ZMS, established in 1990, is the earliest private enterprise in Henan (China) cable business. Our cables are maufactured by the most up-to-date technology, ensuring the highest quality. Our prodcuts includes but not limited to: Overhead lines, Power cables up to 500kv, felxible cables, control cables, rubber cables, fiber optical cable, submarine cables etc. With advanced manufacture technology, rich human resource and effective management system, we guarantee all products are manufacutured strictly in accordance with GB, IEC, BS, NFC, ASTM, DIN standards etc. Beyond quality control, ZMS have been trying its best to offer much higher standard of services rather than expected. During the presentation time, Steven communicated with us for some points and Tyrion did some additions. After the introduction, as per our schedule confirmed before, workshop visiting was coming. Our engineer Mr. Song joined us to explain to Steven & Tyrion the professional technical consulation.
The factory visiting lasted total 3 hours, and clients visited most of our workshops and production line, including: TROESTER 500kv extra-high voltage vertical cross-linking power cable production line introduced from Germany, continuous annealing copper wire drawer, JDP-3500 drum stranding machine, Sheath extruder etc. After the whole visiting and communcation, both Steven and Tyrion thumped up.