(1) According to the design drawings, familiar with master each link, the first audit arrange profile if there is a crossover cable, whether reasonable, the location of the cable bracket creating every cable, for laying cables.
(2) To avoid waste, collect cable arrived, verify the actual length and the length are appropriate design, and test the insulation is unqualified, choose to register, in cable tray number, the cable laying staff to have some idea of MangErBuLuan, civilization construction.
(3) To make temporary cable cards according to the cable list processing have foot length and the cross-section is set quantity.
(4) According to the needs for the tools and materials.
(5) Along the path of laying adequate security lighting installation, the inconvenience ShiGongChu erection of scaffolding.
(6) According to the regulations of cable laying the order table plate number, the cable should be shipped to the location of the construction is convenient.
(7) The check is complete, in cable trench, support, and firm, paint is in accordance with the requirements, the cable pipe was clear, and is ready to string into the traction line, to clear the rubbish and installation path.
(8) In the cable tunnel, channel, shaft, cable interlayer and shift up and down, cross intersections should draw profile, and ready to cable, cable tie.
(9) According to the drawing list and order form to construction, is advantageous for the familiar path, head of the important turning on, arrangement of experienced personnel, ready to communication equipment and contact.
(10) In the extension project if it comes into the charged area, should contact the relevant departments to handle security operation tickets in advance.