Measures Were Taken for Outer Sheath FailureAccording to the analysis of the cause of the outer sheath, it can be seen that the cable line project is a systematic project, only from the design, construction, operation, and maintenance aspects of its entire process management, in order to maximize its safe operation.
1 From the beginning of the des...