The procedure is applicable for the process inspection of extruded insulation for cable and wire production, excluding the triple extrusion method.
For any dated reference documents, only the dated versions are applicable while for undated reference documents, the latest versions including some modified versions are applicable.
GB/T 4909.2 Bare conductor Test Method Part 2: Size measurement.
GB/T 2951.11 General test method on insulation and sheath of power cable and fiber optical cable Part 11: General test method---Measurement on thickness and dimension ---Test on mechanical performance.
3.1 The outer diameter of the conductor core is tested by a micrometer or calipers. The test method shall conform to GB/T 4909.2. Test the number of strands and construction in the core end by eyesight.
3.2 Thermal extension process conforms to Part 9, GB/T 2951.21-2008.
3.3 The thickness of insulation is tested by a projector, conform to GB/T 2951.21-2008.
3.4 Outer diameter of insulation is tested by micrometer or calipers or projector, conforming to GB/T 2951.11
3.5 Marking is tested by eyesight, the max. Distance between markings is tested by tape measure with an accuracy of 1mm or ruler.
3.6 The proportion of green / yellow cover is tested by eyesight.
3.7 The surface quality of insulation is tested by eyesight