Aerial Bundle Cable (ABC cable) is a very innovative concept for overhead power distribution as compared to the conventional bare conductor overhead distribution system.It provides higher level of safety and reliability, lower power losses and ultimate system economy by reducing installation, maintenance and operative cost.
Power cables are used to transmit and distribute electrical energy cables.In the power lines, the proportion of cable is gradually increasing. The power cable is a cable product used to transmit and distribute high-power power in the main line of the power system
The power cables are classified according to different voltage levels, which are divided into the power cables of 450/750V and below, low-voltage cable 0.6/1kv, medium voltage cable 3-35kv, high-voltage cable 350-110kv and ultra-high voltage cable 110-750kv
The power bureau has invited interested parties to submit tender documents for the deployment of underground cables. The locations of the deployment include Ratnapark, Maitighar, Thapathali, Chabahil and Thamel
Rubber Cable is a hard wearing mains electric cable, and it is constructed with a heavy duty HOFR outer sheath which is heat resisting, oil resisting and flame retardant
This cable is designed specifically for the transmission of high currents from electric welding machines to the welding tool on automatically or manually operated line and spot welding machines
XLPE insulated SWA cable, British Standard BS5467 cable specification covers the requirements for low voltage armored cables - both galvanized steel wire armored (multi-core) and non-magnetic aluminum wire armored (single core) - with thermosetting insulation of rated voltages 600/1000V for use in fixed installation in industrial wiring
Nepal and China have launched a joint development of cross-border transmission lines, paving the way for electricity trade between the two neighbors.Nepal has said that the Nepal has submitted a draft memorandum of understanding on the joint development of transmission lines between the two countries.
It is reported that the eastern United Arab Emirates desert area of the first nuclear power plant project is steadily advancing, is expected to officially launched in 2020. The Unit 1 started construction in 2012, has now completed 96%, 2, 3, 4 units are currently completed 84%, 73%, 49%. Overall, the overall completion rate for groups 1 to 4 has exceeded 6...